Kewtech TC5 Inspection & Test Schedule
Kewtech TC5 Inspection & Test Schedule provides a clear way to record test results for domestic installations with distribution boards of up to 12 ways. Users can enter test results and inspection observations as part of the certification record. Each duplicated page creates carbon copies for both the contractor and the customer.
Each Kewtech TC5 Inspection & Test Schedule book provides 20 certificates across 40 sheets. The duplicated format lets both parties retain the same recorded information without completing a second copy by hand. The clear layout also helps users record and retain inspection and test information efficiently.
Kewtech designed the Kewtech TC5 Inspection & Test Schedule to support work carried out in compliance with BS 7671, and the supplied information describes it as suitable for 18th Edition Amendment 4 installations. Within the wider Kewtech certificate range, users can choose TC1 or TC8 for new installations, while TC3 and TC4 cover condition reports for existing installations. TC7 provides an optional observations and remarks record sheet, while TC6 covers schedules of test results for installations with more than 12 ways.
Key Benefits
- Provides a dedicated schedule for recording test results on installations with up to 12 ways.
- Duplicated pages create separate copies for contractor and customer use.
- Carbon-copy pages avoid the need to write the same certification information twice.
- A clear layout helps users enter inspection observations and test results in an organised format.
- Twenty certificates in each book provide multiple records from one booklet.
- Forty sheets support the duplicated certificate format throughout the book.
- Supports certification records for work carried out in compliance with BS 7671.
- Fits within the Kewtech certificate range for documenting new and existing electrical installations.
Common Applications
Kewtech TC5 Inspection & Test Schedule is suitable for a range of testing, maintenance and inspection tasks, including:
- Recording schedules of test results for domestic installations up to 12 ways.
- Recording test results for distribution boards with up to 12 ways.
- Keeping a contractor copy of completed test result records.
- Providing a customer copy of completed test result records.
- Supporting certification records for work carried out in compliance with BS 7671.
- Use with new installation documentation where TC1 or TC8 is used.
- Use with existing installation condition reports using TC3 or TC4.
- Use alongside the optional TC7 observations and remarks record sheet where required.
Why Choose This Model?
TC5 is the schedule option for installations with up to 12 ways, while TC6 is identified for schedules with more than 12 ways. It also provides a different purpose from TC1 and TC8 new installation certificates, TC3 and TC4 condition reports, and the optional TC7 observations and remarks sheet.
